MEJORAMIENTO DE LAS PISTAS, VEREDAS Y REESTRUCTURACIÓN

Detalles del Proyectox

Cliente:Consorcio Supervisor Arriola
Lugar:La Victoria y San Luis – Lima
SNIP N°333597
Año:2018
Categoría:Laboratorio de Ensayos

Descripción de Proyecto

In the modern industrialized world, construction usually involves the translation of designs into reality. A formal design team may be assembled to plan the physical proceedings, and to integrate those proceedings with the other parts. The design usually consists of drawings and specifications, usually prepared by a design team including Architect, civil engineers, mechanical engineers, electrical engineers, structural engineers, fire protection engineers, planning consultants, architectural consultants, and archaeological consultants. The design team is most commonly employed by (i.e. in contract with) the property owner. Under this system, once the design is completed by the design team, a number of construction companies or construction management companies may then be asked to make a bid for the work, either based directly on the design, or on the basis of drawings and a bill of quantities provided by a quantity surveyor.